Skip to content
The Lite Way

Warrington commercial LED retrofit

Commercial Lighting Changed To LED Without Making A Meal Of It

The Lite Way surveys workplaces, supplies the right LED fittings, installs them around your shift pattern and checks the light level before leaving site.

Survey Schedule Fit Check

What we replace

Old Commercial Fittings, Not Whole Buildings

01

Fluorescent Panels

Yellowed 600 by 600 panels changed to clean LED panels with drivers matched to the ceiling access.

02

Twin Battens

Workshop and stockroom battens replaced with efficient linear fittings that stop the weekly tube hunt.

03

Low Bays

Production areas and loading rooms brought up to a usable working light without over-lighting the place.

04

High Bays

Warehouse fittings surveyed for mounting height, access, beam angle and any sensor control before pricing.

05

Emergency Fittings

Failed or obsolete emergency lighting replaced, labelled and given a basic function test before handover.

06

Stockroom Lighting

Back of house spaces made safer for picking, carrying and counting without specifying decorative feature lighting.

Why it pays

Less Energy, Less Maintenance, Better Working Light

Lower running cost

LED replacements cut load where fluorescent tubes and old high bays are still burning all day.

Fewer failures

No boxes of spare tubes, no failed starters, no repeated calls for the same dark corner.

Cleaner light

Workbenches, forklift lanes and picking shelves become easier to read without guessing at colours or labels.

Safer routes

Emergency fittings and tired stockroom lights can be dealt with while the main retrofit is already underway.

How the job runs

A Retrofit Schedule You Can Hand To Operations

  1. 01

    Survey

    Matt checks fitting count, ceiling height, access, working hours, emergency lighting and any areas that cannot be shut down.

  2. 02

    Quote

    You receive a written quote within 2 working days for sites under 150 fittings, or within 5 working days for larger premises.

  3. 03

    Schedule

    The product schedule, datasheets, RAMS, waste route and installation sequence are agreed before anyone arrives with steps.

  4. 04

    Install

    Most shops, offices and small workshops finish in 1 day. Warehouses and production areas usually take 2 to 5 days or nights.

  5. 05

    Remove Waste

    Old fluorescent tubes, lamps and fittings are removed from site and sent through a licensed WEEE route.

  6. 06

    Check Light

    Light levels are checked after installation so the finished job is more than a box of fittings on a ceiling.

A note from Matt

The Job I Still Talk About

Matt Renshaw founded The Lite Way in 2024 after fifteen years working on commercial electrical maintenance and energy-saving refits around the North West. I am proud of a small Warrington packaging unit where thirty-two failing fluorescent battens were changed over a Friday evening. By midnight the forklift lanes looked cleaner. On Monday the supervisor sent me a photo because the pickers had stopped bringing their own torches.

Service radius

Warrington First, Then The North West Within Reach

Warrington 35 mile normal radius 60 miles by project

Normal travel radius is 35 miles from Warrington town centre, covering Cheshire, Greater Manchester, Merseyside and parts of North Wales.

Larger projects are considered up to 60 miles when the fitting count, access and programme make sense.

  • Typical survey lead time is 3 to 7 working days from first email.
  • Saturday surveys are by appointment between 8:00am and 12:00pm.
  • Minimum installed order is £750 + VAT or 12 fittings, whichever is higher.

Quick prices

Typical Installed Ranges Before A Survey

LED Panel Swap

£68-£95 + VAT

Supplied and fitted per fitting, depending on ceiling access and driver type.

Open full price page

High-Bay Replacement

£185-£340 + VAT

Supplied and fitted per fitting, depending on mounting height, access equipment and controls.

See warehouse examples

Emergency Lighting

£110-£210 + VAT

Per fitting, including basic function test and asset label.

Check minimum order

Seasonal closure

Christmas Shutdown Enquiries

I close properly between Christmas Eve and the first working Monday in January. If we have already booked your shutdown work, you are covered. If it is a new enquiry, I will reply when I am back at the desk.